Gas Power Plant In Bangladesh

Gas power plant advantages in BD.  These advantages are different from the other power plant. The main point is that we can go full load in few minutes(25-35) and also can supply in between those time. But the other power plant takes 36 hrs to start their plant-like (Thermal Coal based power plant). Gas PP has lower equipment from other PP. We can run it low operating pressure for cooling purpose we do not need to use high lube oil cost and the consumption is very low. So for cooling purpose, we can save huge money Also we can save area for the same power production because of for gas power plant we do not need huge space like (hydro PP) and goes for 30 or 40k hrs before  1st maintenance.

Gas power plant is easy to installed within a short period, On the other hand, the side